Sitara Chemicals to expand its existing Coal-Fired Power Plant by further 40MW

News Image

MG News | October 21, 2020 at 12:18 PM GMT+05:00

0:00

October 21, 2020 (MLN): The Board of Directors of the Sitara Chemical Industries Limited, in its meeting held on October 20, 2020, has approved the expansion of its existing Coal-Fired Power Plant by a further 40MW to meet its existing and future requirements.

As per notification to Pakistan Stock Exchange, the estimated project cost is Rs 5.5 billion.

Copyright Mettis Link News

Related News

Name Price/Vol %Chg/NChg
KSE100 156,180.94
423.57M
0.51%
796.43
ALLSHR 95,690.82
1,354.89M
0.59%
557.25
KSE30 47,714.39
199.12M
0.52%
247.40
KMI30 229,722.09
134.66M
0.91%
2076.87
KMIALLSHR 64,420.07
581.33M
0.83%
532.01
BKTi 41,969.52
122.61M
0.50%
207.74
OGTi 31,991.76
10.82M
1.18%
372.62
Symbol Bid/Ask High/Low
Name Last High/Low Chg/%Chg
BITCOIN FUTURES 115,535.00 116,415.00
114,960.00
-40.00
-0.03%
BRENT CRUDE 68.37 68.42
67.01
0.93
1.38%
RICHARDS BAY COAL MONTHLY 84.00 0.00
0.00
-0.40
-0.47%
ROTTERDAM COAL MONTHLY 93.35 93.50
93.15
0.50
0.54%
USD RBD PALM OLEIN 1,106.50 1,106.50
1,106.50
0.00
0.00%
CRUDE OIL - WTI 64.44 64.47
62.89
1.14
1.80%
SUGAR #11 WORLD 15.87 16.10
15.82
-0.13
-0.81%

Chart of the Day


Latest News

Top 5 things to watch in this week

Pakistan Stock Movers
Name Last Chg/%Chg
Name Last Chg/%Chg