Fast Cables adds 1.1 MW solar power at manufacturing site

News Image

MG News | May 27, 2025 at 09:27 AM GMT+05:00

0:00

May 27, 2025 (MLN): Fast Cables Limited (PSX: FCL) has successfully commissioned an additional 1.1 MW solar power system at its manufacturing facility.

This is in addition to the previously installed 1.9 MW capacity, bringing the total installed solar generation capacity to 3 MW, the notification issued to the local bourse.

This development will further enhance the Company's energy mix by enabling it to meet a considerable portion of its power needs through clean and renewable sources.

The initiative underscores Fast Cables' unwavering commitment to environmental sustainability, energy efficiency, operational savings, and responsible corporate citizenship.

Copyright Mettis Link News

Related News

Name Price/Vol %Chg/NChg
KSE100 184,129.58
798.69M
-1.97%
-3702.50
ALLSHR 110,763.73
1,266.28M
-1.85%
-2087.96
KSE30 56,278.51
173.32M
-2.19%
-1261.46
KMI30 259,907.89
102.57M
-2.03%
-5380.16
KMIALLSHR 71,198.64
822.49M
-1.72%
-1247.03
BKTi 53,693.69
102.25M
-2.59%
-1425.61
OGTi 37,589.24
28.20M
-2.72%
-1052.27
Symbol Bid/Ask High/Low
Name Last High/Low Chg/%Chg
BITCOIN FUTURES 70,580.00 71,690.00
60,005.00
6785.00
10.64%
BRENT CRUDE 68.10 68.83
66.56
0.55
0.81%
RICHARDS BAY COAL MONTHLY 96.00 96.00
96.00
1.50
1.59%
ROTTERDAM COAL MONTHLY 102.75 103.25
101.30
2.25
2.24%
USD RBD PALM OLEIN 1,071.50 1,071.50
1,071.50
0.00
0.00%
CRUDE OIL - WTI 63.50 64.58
62.20
0.21
0.33%
SUGAR #11 WORLD 14.14 14.30
14.07
-0.13
-0.91%

Chart of the Day


Latest News
February 07, 2026 at 11:50 AM GMT+05:00

Key Pakistan Market Stats and Economic Indicators


February 07, 2026 at 12:15 AM GMT+05:00

Weekly Market Roundup


February 06, 2026 at 09:31 PM GMT+05:00

Intermarket Securities appoints Khurram Bashir as Deputy CEO


February 06, 2026 at 07:30 PM GMT+05:00

SBP reserves rise to $16.16bn



Top 5 things to watch in this week

Pakistan Stock Movers
Name Last Chg/%Chg
Name Last Chg/%Chg