High-loss areas face load-shedding up to 9 hours: KE

News Image

MG News | June 10, 2022 at 11:33 AM GMT+05:00

0:00

June 10, 2022 (MLN): In an effort to overcome the ongoing power shortfall, K-Electric (KE) has issued a new load-shedding schedule for up to nine hours in high-loss areas of Karachi with effect from Thursday in line with National Power Policy.

While Karachiites living in low-loss areas are facing three-hour load-shedding daily within KE’s service territory. Earlier, these areas were exempted from load-shedding.

As per media reports, the new load shedding schedule was planned to provide one to two hours relief in high-loss areas where prolonged load-shedding was being observed.

Copyright Mettis Link News

Related News

Name Price/Vol %Chg/NChg
KSE100 140,073.62
115.15M
1.20%
1661.37
ALLSHR 86,726.84
234.90M
1.19%
1023.88
KSE30 42,834.24
64.90M
1.37%
579.40
KMI30 197,407.42
68.62M
1.70%
3297.83
KMIALLSHR 57,546.52
120.05M
1.47%
832.85
BKTi 38,209.72
8.14M
1.00%
378.38
OGTi 28,511.02
31.88M
3.90%
1070.39
Symbol Bid/Ask High/Low
Name Last High/Low Chg/%Chg
BITCOIN FUTURES 119,400.00 119,430.00
117,905.00
1780.00
1.51%
BRENT CRUDE 72.20 72.82
72.16
-1.04
-1.42%
RICHARDS BAY COAL MONTHLY 96.50 0.00
0.00
2.20
2.33%
ROTTERDAM COAL MONTHLY 104.50 104.50
104.50
-0.30
-0.29%
USD RBD PALM OLEIN 998.50 998.50
998.50
0.00
0.00%
CRUDE OIL - WTI 69.82 70.41
69.80
-0.18
-0.26%
SUGAR #11 WORLD 16.46 16.58
16.37
-0.13
-0.78%

Chart of the Day


Latest News
July 31, 2025 at 12:06 PM GMT+05:00

Crescent Star Insurance resumes 'Guarantee Business'


July 31, 2025 at 12:01 PM GMT+05:00

Bawany Air Products back on PSX Normal Counter


July 31, 2025 at 11:20 AM GMT+05:00

Sitara Peroxide narrows annual loss by 77%



Top 5 things to watch in this week

Pakistan Stock Movers
Name Last Chg/%Chg
Name Last Chg/%Chg