Cherat Cement commissions 11.35MW Solar Power plant at Nowshera factory site

News Image

By MG News | March 16, 2022 at 11:08 AM GMT+05:00

0:00

March 16, 2022 (MLN): Cherat Cement Company Limited has commissioned 11.35 MW Solar Power plant at its Factory Site Nowshera, KPK, company’s filing on bourse showed today.

The remaining approximate 1.7MW is expected to be energized in the next two months time.

Moreover, this will add to the captive power generation capacity of the company, the notice said.

Copyright Mettis Link News

Related News

Name Price/Vol %Chg/NChg
KSE100 127,443.91
120.39M
1.45%
1816.60
ALLSHR 79,323.49
374.35M
0.94%
738.77
KSE30 38,802.37
34.08M
1.70%
648.58
KMI30 186,997.60
45.82M
1.14%
2111.10
KMIALLSHR 54,122.55
198.52M
0.67%
358.74
BKTi 32,467.95
27.66M
1.71%
546.27
OGTi 27,793.86
1.59M
0.07%
19.88
Symbol Bid/Ask High/Low
Name Last High/Low Chg/%Chg
BITCOIN FUTURES 107,170.00 108,105.00
107,145.00
-1065.00
-0.98%
BRENT CRUDE 66.44 66.63
66.34
-0.30
-0.45%
RICHARDS BAY COAL MONTHLY 97.00 97.00
97.00
1.05
1.09%
ROTTERDAM COAL MONTHLY 107.65 107.65
105.85
1.25
1.17%
USD RBD PALM OLEIN 998.50 998.50
998.50
0.00
0.00%
CRUDE OIL - WTI 64.78 65.02
64.67
-0.33
-0.51%
SUGAR #11 WORLD 16.19 16.74
16.14
-0.52
-3.11%

Chart of the Day


Latest News
July 01, 2025 at 10:48 AM GMT+05:00

VIS upgrades entity ratings of Faysal Bank Ltd


July 01, 2025 at 10:45 AM GMT+05:00

FBR delivers historic 26% tax collection surge


July 01, 2025 at 09:56 AM GMT+05:00

PSX Opening Bell: Green and Growing



Top 5 things to watch in this week

Pakistan Stock Movers
Name Last Chg/%Chg
Name Last Chg/%Chg