Mettis Global News
Mettis Global News
Mettis Global News
Mettis Global News

MPS Preview: High for Longer

Five refineries with 417,400 BPD oil installed capacity operating in Pakistan

Share on facebook
Share on twitter
Share on linkedin
Share on whatsapp

June 17, 2020: Currently, five refineries are operating in the country with an overall installed capacity of 417,400 barrel per day (BPD) oil and contributing significantly in meeting the petroleum needs through indigenous production.

Pak Arab Refinery Limited (PARCO) has 100,000 BPD oil refining capacity, Attock Refinery Limited (ARL) 53,400 BPD, Byco Petroleum Pakistan Limited (Byco) 150,000 BPD, National Refinery Limited (NRL) 64,000 BPD and Pakistan Refinery Limited 50,000 BPD, according to the Economic Survey 2019-20.

As per the data, Pakistan’s total consumption of petroleum products stood at 19.68 Million Tons (MTs) during the fiscal year 2019-20, out of which 11.59 MTs was achieved through local refineries and 8.09 MT through import.

The petrol consumption in the country was 7.6 MTs per annum, out of which 30 percent was being catered from local refineries and rest was being imported to meet the national demand.

Similarly, the consumption of Diesel was around 7.3 MTs/annum. The local production can meet 65 percent of the total demand, while the rest is being imported.

At present, thirty Oil Marketing Companies (OMCs) including Pakistan State Oil Company Limited (PSOCL), Shell Pakistan Limited (SPL), Total Parco Pakistan Limited (TPPL), Attock Petroleum Limited (APL), Gas & Oil Pakistan Private Limited (GOPPL) and Hascol Storage Limited (HPL) are operating in the country.

Among these OMCs, PSO leads with an overall market share of 42.5 percent, followed by APL with 10.9 percent, TPPL 10.3 percent, HPL 9.8 percent and SPL 8.3 percent. OMCs receive, store and distribute petroleum products in the country by utilizing their supply arrangements and infrastructure, comprising of their installations, storage depots, oil pipelines and retail outlets.

The bulk of 19.68 million tonnes of petroleum products required by Pakistan’s market is transported by road (around 74 percent), Oil pipelines (24.4 percent) and Railways (1.5 percent).

APP

Posted on: 2020-06-17T15:17:00+05:00

35293