Mughal Iron & Steel adds 20MW Grid Load to sanctioned Grid Load capacity

News Image

By MG News | August 28, 2020 at 04:52 PM GMT+05:00

0:00

August 28, 2020 (MLN): Mughal Iron & Steel Industries Limited (MUGHAL) has informed via notification to PSX that the company has energized and added 20MW Grid Load in the total available load capacity.

Resultantly, the company has now a total of 79.99 MW energizing load available from its132-KV dedicated Grid Station.

Previously, the company had a total of 59.99 MW energized load available from its 132-KV dedicated Grid Station.

Copyright Mettis Link News

 

Related News

Name Price/Vol %Chg/NChg
KSE100 125,627.31
258.99M
1.00%
1248.25
ALLSHR 78,584.71
1,142.41M
1.16%
904.89
KSE30 38,153.79
69.25M
0.63%
238.06
KMI30 184,886.50
91.38M
0.01%
13.72
KMIALLSHR 53,763.81
554.57M
0.54%
290.61
BKTi 31,921.68
33.15M
1.78%
557.94
OGTi 27,773.98
9.65M
-0.40%
-112.21
Symbol Bid/Ask High/Low
Name Last High/Low Chg/%Chg
BITCOIN FUTURES 107,555.00 107,860.00
107,530.00
-680.00
-0.63%
BRENT CRUDE 66.58 66.63
66.54
-0.16
-0.24%
RICHARDS BAY COAL MONTHLY 97.00 97.00
97.00
1.05
1.09%
ROTTERDAM COAL MONTHLY 107.65 107.65
105.85
1.25
1.17%
USD RBD PALM OLEIN 998.50 998.50
998.50
0.00
0.00%
CRUDE OIL - WTI 64.92 65.02
64.83
-0.19
-0.29%
SUGAR #11 WORLD 16.19 16.74
16.14
-0.52
-3.11%

Chart of the Day


Latest News
June 30, 2025 at 11:55 PM GMT+05:00

TRG: Dominos Tumbling for the Management


June 30, 2025 at 10:08 PM GMT+05:00

SBP’s March FX intervention stands at $860m



Top 5 things to watch in this week

Pakistan Stock Movers
Name Last Chg/%Chg
Name Last Chg/%Chg