HUBC’s two engines at Narowal Plant unavailable for power generation

News Image

MG News | March 04, 2022 at 12:53 PM GMT+05:00

0:00

March 04, 2022 (MLN): Hub Power Company Limited (PSX: HUBC) has informed that the alternators of two engines at Narowal Plant have developed a fault due to which these engines having 38 MW capacity will not be available for electricity generation.

They have been placed under forced outages to investigate and fix the fault.

Narowal Plant is owned and operated by Narowal Energy Limited, a wholly-owned subsidiary of HUBC, and has a gross capacity of 225 MW comprising of eleven reciprocating engines and one steam turbine.

Copyright Mettis Link News

Related News

Name Price/Vol %Chg/NChg
KSE100 162,994.17
366.14M
-1.71%
-2829.70
ALLSHR 97,525.91
833.18M
-1.65%
-1634.99
KSE30 49,090.22
171.05M
-2.02%
-1011.73
KMI30 234,097.76
141.71M
-1.92%
-4583.61
KMIALLSHR 63,284.58
381.76M
-1.79%
-1151.00
BKTi 45,458.10
90.77M
-1.53%
-707.82
OGTi 33,162.89
14.24M
-2.82%
-962.44
Symbol Bid/Ask High/Low
Name Last High/Low Chg/%Chg
BITCOIN FUTURES 76,555.00 76,780.00
76,515.00
-185.00
-0.24%
BRENT CRUDE 110.86 114.70
107.07
0.42
0.38%
RICHARDS BAY COAL MONTHLY 113.00 113.00
113.00
-1.30
-1.14%
ROTTERDAM COAL MONTHLY 109.25 112.00
108.20
-1.20
-1.09%
USD RBD PALM OLEIN 1,191.50 1,191.50
1,191.50
0.00
0.00%
CRUDE OIL - WTI 105.65 105.97
105.06
0.58
0.55%
SUGAR #11 WORLD 14.61 14.85
14.49
-0.16
-1.08%

Chart of the Day


Latest News
May 01, 2026 at 12:00 AM GMT+05:00

Petrol, Diesel prices jump by upto Rs19.39 per litre


April 30, 2026 at 08:49 PM GMT+05:00

PTCL dismisses e& exit speculation


April 30, 2026 at 08:41 PM GMT+05:00

Property files era ends


April 30, 2026 at 08:31 PM GMT+05:00

FFC announces financial results of First Quarter 2026



Top 5 things to watch in this week

Pakistan Stock Movers
Name Last Chg/%Chg
Name Last Chg/%Chg