Mettis Global News
Mettis Global News
Mettis Global News
Mettis Global News

MPS Preview: High for Longer

High-loss areas face load-shedding up to 9 hours: KE

High-loss areas face load-shedding up to 9 hours: KE
High-loss areas face load-shedding up to 9 hours: KE
Share on facebook
Share on twitter
Share on linkedin
Share on whatsapp

June 10, 2022 (MLN): In an effort to overcome the ongoing power shortfall, K-Electric (KE) has issued a new load-shedding schedule for up to nine hours in high-loss areas of Karachi with effect from Thursday in line with National Power Policy.

While Karachiites living in low-loss areas are facing three-hour load-shedding daily within KE’s service territory. Earlier, these areas were exempted from load-shedding.

As per media reports, the new load shedding schedule was planned to provide one to two hours relief in high-loss areas where prolonged load-shedding was being observed.

Copyright Mettis Link News

Posted on: 2022-06-10T11:33:09+05:00

33336