Govt begins preparations for Monsoon 2027, eyes climate-resilient planning
MG News | September 09, 2026 at 09:50 AM GMT+05:00
September 09, 2026 (MLN): Pakistan has begun
preparations for Monsoon 2027, nearly a year in advance, as the government
moves to shift the country’s disaster-management strategy from emergency
response towards climate-resilient planning.
Federal Planning Minister Professor Ahsan Iqbal on
Tuesday directed the National Disaster Management Authority (NDMA), provincial
disaster authorities and relevant departments to immediately start preparations
for next year’s monsoon, said a press release issued.
Chairing a meeting of the Prime Minister’s Emergency
Response Committee on Monsoon Preparedness 2026, Ahsan Iqbal said
flood-prevention projects require eight to 10 months of technical assessment,
planning, approvals, financing and execution.
He warned that delaying preparations until the arrival
of the next monsoon would increase costs while reducing the effectiveness of
interventions.
The government has also ordered a district-wise audit of
areas affected by floods in 2022, 2025 and the current monsoon season.
The audit will be jointly undertaken by provincial
disaster-management authorities, irrigation departments, communications and
works departments, district administrations and other relevant agencies.
A key concern identified during the meeting was the
growing vulnerability of infrastructure built under historical rainfall and
flood assumptions.
According to the government, many bridges, culverts,
drains and flood-disposal structures were designed decades ago and may no
longer be capable of handling rainfall and water flows intensified by climate
change.
Undersized bridges and culverts can obstruct water
discharge, while drainage systems designed for lower flows can overflow and
inundate populated areas.
The audit will also identify floodplain encroachments
and obstructions affecting protective and drainage infrastructure.
Technically viable and time-sensitive flood-protection
projects identified through the exercise will be considered for Green Channel
processing, allowing priority schemes to move more rapidly through approval and
funding stages.
Provincial governments have separately been instructed
to prepare recovery and rehabilitation roadmaps covering both outstanding flood
damage and preventive measures required before the next monsoon.
The initial audit is expected to be completed within one
month, after which a time-bound action plan will be prepared. Progress will
then be reviewed quarterly.
The committee also identified plastic waste as a major
contributor to urban flooding.
According to the meeting, polythene bags and solid waste
frequently block drains, culverts and water outlets, worsening flooding during
periods of intense rainfall.
The government plans to pair enforcement against plastic
waste with a broader behaviour-change campaign and a transition strategy
covering the plastic supply chain, including imports, manufacturing, retail use
and waste management.
The meeting was also briefed that Monsoon 2026 had
entered its withdrawal phase, with no significant monsoon system currently
expected to affect Pakistan.
However, rainfall deficits of more than 60% in parts of
Sindh and Balochistan have created serious water stress, while above-normal
temperatures are expected to persist.
The cumulative monsoon toll presented to the committee
stood at 181 deaths and 515 injuries, while around 1,740 houses or structures
had been damaged.
House collapses accounted for 95 deaths, or
approximately 52% of the total reported fatalities.
The NDMA said it was conducting a technical assessment
of vulnerable housing and had shared reconstruction models with provincial
authorities. A low-cost and environmentally sustainable reconstruction
programme is expected to be implemented over the next two to three months.
Around 640 tonnes of relief supplies, including tents,
food and camp supplies, have already been dispatched to affected areas.
The government also reviewed Pakistan’s dispatch of 100
tonnes of humanitarian assistance to Nepal, including tents, blankets, hygiene
supplies and medicines.
Ahsan Iqbal directed the NDMA to submit a comprehensive
Monsoon 2026 closure report by the third week of September, documenting
response operations, institutional gaps, lessons learned and implementation of
committee directives.
The government's early move towards Monsoon 2027
preparation underscores a growing recognition that Pakistan's climate and flood
risks require long-term infrastructure planning rather than repeated reliance
on post-disaster relief.
Copyright Mettis Link News
Related News
| Name | Price/Vol | %Chg/NChg |
|---|---|---|
| KSE100 | 172,729.82 18.27M | 0.05% 87.66 |
| ALLSHR | 104,730.42 59.46M | 0.07% 72.01 |
| KSE30 | 51,371.94 6.92M | -0.08% -42.70 |
| KMI30 | 246,107.04 7.54M | 0.00% -0.04 |
| KMIALLSHR | 67,870.59 38.95M | 0.07% 44.13 |
| BKTi | 48,045.07 3.81M | -0.18% -87.15 |
| OGTi | 35,115.00 0.33M | 0.09% 32.93 |
| Symbol | Bid/Ask | High/Low |
|---|
| Name | Last | High/Low | Chg/%Chg |
|---|---|---|---|
| BITCOIN FUTURES | 79,060.00 | 79,135.00 78,555.00 | 475.00 0.60% |
| BRENT CRUDE | 99.06 | 99.68 99.06 | 1.14 1.16% |
| RICHARDS BAY COAL MONTHLY | 130.00 | 130.00 130.00 | 2.40 1.88% |
| ROTTERDAM COAL MONTHLY | 140.00 | 0.00 0.00 | 2.25 1.63% |
| USD RBD PALM OLEIN | 1,228.00 | 1,228.00 1,228.00 | 0.00 0.00% |
| CRUDE OIL - WTI | 93.99 | 94.78 93.97 | 0.96 1.03% |
| SUGAR #11 WORLD | 18.08 | 18.45 17.89 | 0.01 0.06% |
Chart of the Day
Latest News
Top 5 things to watch in this week
Pakistan Stock Movers
| Name | Last | Chg/%Chg |
|---|
| Name | Last | Chg/%Chg |
|---|
Pakistan Total Debt and Liabilities