Defective alternator at Narowal Plant returned in service: HUBC

News Image

MG News | August 29, 2022 at 02:56 PM GMT+05:00

0:00

August 29, 2022 (MLN): Hub Power Company Limited (PSX: HUBC) on Monday informed that the defective alternator at Narowal Plant has been returned in service and available for electricity generation to the power purchaser from August 25, 2022.

Meanwhile, the work is in progress on the other alternator to retore its service for power generation.

Accordingly, ten out of eleven reciprocating engines and one steam turbine are in service.

To note, Narowal Plant is owned and operated by Narowal Energy Limited, a wholly owned subsidiary of the Hub Power Company Limited.

Copyright Mettis Link News

Related News

Name Price/Vol %Chg/NChg
KSE100 135,939.87
307.74M
-0.41%
-562.67
ALLSHR 84,600.38
877.08M
-0.56%
-479.52
KSE30 41,373.68
101.15M
-0.43%
-178.94
KMI30 191,069.98
82.45M
-1.17%
-2260.79
KMIALLSHR 55,738.07
422.01M
-1.03%
-577.24
BKTi 38,489.75
45.79M
-0.02%
-8.33
OGTi 27,788.15
6.87M
-1.24%
-350.24
Symbol Bid/Ask High/Low
Name Last High/Low Chg/%Chg
BITCOIN FUTURES 117,505.00 120,695.00
116,660.00
-2730.00
-2.27%
BRENT CRUDE 69.23 69.37
68.60
0.02
0.03%
RICHARDS BAY COAL MONTHLY 97.50 0.00
0.00
0.25
0.26%
ROTTERDAM COAL MONTHLY 106.50 0.00
0.00
-0.05
-0.05%
USD RBD PALM OLEIN 998.50 998.50
998.50
0.00
0.00%
CRUDE OIL - WTI 66.91 67.09
66.27
-0.07
-0.10%
SUGAR #11 WORLD 16.46 16.51
16.25
0.16
0.98%

Chart of the Day


Latest News
July 15, 2025 at 05:22 PM GMT+05:00

Big industry output rises 2.29% in May


July 15, 2025 at 04:22 PM GMT+05:00

SYS set for 71% profit surge on global tailwinds


July 15, 2025 at 04:15 PM GMT+05:00

Gold price in Pakistan falls Rs700 per tola



Top 5 things to watch in this week

Pakistan Stock Movers
Name Last Chg/%Chg
Name Last Chg/%Chg