Work on 2 Nuclear Power Plants in Karachi underway

News Image

MG News | June 30, 2017 at 02:22 PM GMT+05:00

0:00

The work on two Karachi nuclear power projects with cumulative capacity of 2200 megawatts is underway.

The power plants are being completed under China-Pakistan Economic Corridor (CPEC) projects at a cost of over $9 billion. These power plants are expected to start producing electricity by the end of next year.

Similarly, work on 1320 Megawatts coal based power plants at port Qasim in Karachi, 1320 megawatts coal based power project in Thar coal field is also underway.

Related News

Name Price/Vol %Chg/NChg
KSE100 138,600.67
259.89M
1.63%
2220.70
ALLSHR 85,749.27
672.14M
1.30%
1100.91
KSE30 42,304.45
89.76M
1.83%
758.22
KMI30 195,249.65
95.76M
1.84%
3529.89
KMIALLSHR 56,449.64
386.62M
1.11%
621.90
BKTi 38,471.36
14.16M
1.70%
643.75
OGTi 27,777.30
11.76M
0.39%
106.63
Symbol Bid/Ask High/Low
Name Last High/Low Chg/%Chg
BITCOIN FUTURES 119,335.00 119,915.00
118,035.00
-295.00
-0.25%
BRENT CRUDE 68.47 69.01
68.27
-0.05
-0.07%
RICHARDS BAY COAL MONTHLY 96.50 0.00
0.00
0.95
0.99%
ROTTERDAM COAL MONTHLY 104.50 0.00
0.00
-0.65
-0.62%
USD RBD PALM OLEIN 998.50 998.50
998.50
0.00
0.00%
CRUDE OIL - WTI 66.49 66.99
66.29
0.11
0.17%
SUGAR #11 WORLD 16.80 16.84
16.54
0.24
1.45%

Chart of the Day


Latest News
July 17, 2025 at 02:52 PM GMT+05:00

SLCL signals revival with credit settlements underway


July 17, 2025 at 02:42 PM GMT+05:00

Fateh Sports Wear looks to resume operations soon


July 17, 2025 at 01:47 PM GMT+05:00

OMO Result: SBP injects over Rs902bn


July 17, 2025 at 01:03 PM GMT+05:00

Global value chains drove growth in developing nations



Top 5 things to watch in this week

Pakistan Stock Movers
Name Last Chg/%Chg
Name Last Chg/%Chg