Work on 2 Nuclear Power Plants in Karachi underway

News Image

MG News | June 30, 2017 at 02:22 PM GMT+05:00

The work on two Karachi nuclear power projects with cumulative capacity of 2200 megawatts is underway.

The power plants are being completed under China-Pakistan Economic Corridor (CPEC) projects at a cost of over $9 billion. These power plants are expected to start producing electricity by the end of next year.

Similarly, work on 1320 Megawatts coal based power plants at port Qasim in Karachi, 1320 megawatts coal based power project in Thar coal field is also underway.

Related News

Name Price/Vol %Chg/NChg
KSE100 169,600.41
183.50M
-0.48%
-825.22
ALLSHR 102,686.26
565.98M
-0.36%
-370.76
KSE30 50,456.98
75.27M
-0.51%
-260.85
KMI30 242,899.57
56.32M
-0.49%
-1202.28
KMIALLSHR 66,568.03
354.92M
-0.38%
-251.61
BKTi 46,884.49
11.66M
-0.44%
-204.90
OGTi 34,745.74
4.31M
-0.76%
-266.71
Symbol Bid/Ask High/Low
Name Last High/Low Chg/%Chg
BITCOIN FUTURES 83,945.00 84,930.00
83,100.00
155.00
0.19%
BRENT CRUDE 102.32 107.87
102.30
-2.96
-2.81%
RICHARDS BAY COAL MONTHLY 123.00 0.00
0.00
-1.30
-1.05%
ROTTERDAM COAL MONTHLY 137.40 137.40
135.80
-0.60
-0.43%
USD RBD PALM OLEIN 1,167.50 1,167.50
1,167.50
0.00
0.00%
CRUDE OIL - WTI 89.09 94.74
89.06
-3.51
-3.79%
SUGAR #11 WORLD 18.84 19.02
18.40
0.28
1.51%

Chart of the Day


Latest News
September 29, 2026 at 11:52 PM GMT+05:00

Petrol price down Rs1.49, diesel Rs2.73 from Sept 30


September 29, 2026 at 04:41 PM GMT+05:00

Gold price in Pakistan falls Rs800 per tola


September 29, 2026 at 04:29 PM GMT+05:00

PKR gains 3 paisa against USD, settles at 277.12



Top 5 things to watch in this week

Pakistan Stock Movers
Name Last Chg/%Chg
Name Last Chg/%Chg