Neelum Jhelum hydel power station to shut down from January 10

News Image

By MG News | January 05, 2024 at 04:23 PM GMT+05:00

0:00

January 05, 2024 (MLN): The Neelum Jhelum hydel power station will cease electricity generation from January 10, 2024, during the current low-flow season for the inspection of its 3.5-kilometer-long tailrace tunnel. 

The low water flows in the rivers during the low-flow season are deemed ideal for the inspection of hydel power stations.

Consequently, inspections of numerous hydel power stations are carried out during this period.

Neelum Jhelum is a run-of-the-river hydropower project, that started electricity generation in April 2018.

It envisages the diversion of Neelum River through a system of tunnels having out fall into Jhelum River.

Neelum Jhelum Hydropower Project has been constructed in a very difficult mountainous terrain, while 90% of the project is underground.

The project consists of a dam, 51.7-Km long underground water way system comprising of 48.2-Km headrace tunnel and 3.5-Km tailrace tunnel, an underground power house, and a switch yard.

The project has an installed generation capacity of 969 MW with four generating units of 242.25 MW each.

Copyright Mettis Link News

Related News

Name Price/Vol %Chg/NChg
KSE100 127,834.63
229.48M
1.76%
2207.31
ALLSHR 79,577.28
651.28M
1.26%
992.57
KSE30 38,913.71
79.74M
1.99%
759.92
KMI30 186,840.58
95.72M
1.06%
1954.09
KMIALLSHR 54,178.04
355.09M
0.77%
414.24
BKTi 32,961.58
37.56M
3.26%
1039.90
OGTi 27,881.02
5.55M
0.39%
107.03
Symbol Bid/Ask High/Low
Name Last High/Low Chg/%Chg
BITCOIN FUTURES 107,435.00 108,105.00
107,040.00
-800.00
-0.74%
BRENT CRUDE 66.78 66.93
66.34
0.04
0.06%
RICHARDS BAY COAL MONTHLY 97.00 0.00
0.00
0.20
0.21%
ROTTERDAM COAL MONTHLY 107.65 0.00
0.00
0.40
0.37%
USD RBD PALM OLEIN 998.50 998.50
998.50
0.00
0.00%
CRUDE OIL - WTI 65.14 65.27
64.67
0.03
0.05%
SUGAR #11 WORLD 16.17 16.21
16.16
-0.03
-0.19%

Chart of the Day


Latest News
July 01, 2025 at 12:51 PM GMT+05:00

VIS reaffirms entity ratings of Habib Bank Ltd


July 01, 2025 at 12:23 PM GMT+05:00

GCIL, MARI sign term sheet for gas processing project


July 01, 2025 at 12:13 PM GMT+05:00

VIS reaffirms entity ratings of National Bank Ltd


July 01, 2025 at 11:49 AM GMT+05:00

PSX enhances complaint management system



Top 5 things to watch in this week

Pakistan Stock Movers
Name Last Chg/%Chg
Name Last Chg/%Chg