Attock Cement to install Captive Solar Power Plant at its existing premises

News Image

MG News | June 20, 2019 at 03:32 PM GMT+05:00

0:00

June 20, 2019 (MLN): The Board of Directors of Attock Cement Pakistan Limited has approved the installation of Captive Solar Power Plant of 7 MW at its existing factory premises.

Copyright Mettis Link News

Related News

Name Price/Vol %Chg/NChg
KSE100 156,575.38
244.89M
6.89%
10095.23
ALLSHR 93,976.28
407.66M
6.31%
5575.14
KSE30 48,195.39
115.81M
7.11%
3198.89
KMI30 225,844.15
104.51M
7.52%
15804.74
KMIALLSHR 61,084.62
238.36M
6.58%
3768.90
BKTi 45,138.71
47.42M
6.55%
2774.21
OGTi 33,406.40
14.45M
6.12%
1925.91
Symbol Bid/Ask High/Low
Name Last High/Low Chg/%Chg
BITCOIN FUTURES 70,535.00 70,765.00
68,485.00
1330.00
1.92%
BRENT CRUDE 91.00 95.04
88.05
-7.96
-8.04%
RICHARDS BAY COAL MONTHLY 99.40 0.00
0.00
-13.60
-12.04%
ROTTERDAM COAL MONTHLY 132.00 134.20
132.00
5.05
3.98%
USD RBD PALM OLEIN 1,083.50 1,083.50
1,083.50
0.00
0.00%
CRUDE OIL - WTI 86.82 91.48
84.43
-7.95
-8.39%
SUGAR #11 WORLD 14.62 14.64
14.25
0.52
3.69%

Chart of the Day


Latest News

Top 5 things to watch in this week

Pakistan Stock Movers
Name Last Chg/%Chg
Name Last Chg/%Chg