Attock Cement to install Captive Solar Power Plant at its existing premises

June 20, 2019 (MLN): The Board of Directors of Attock Cement Pakistan Limited has approved the installation of Captive Solar Power Plant of 7 MW at its existing factory premises.

Copyright Mettis Link News

Posted on: 2019-06-20T15:32:00+05:00

28492