Gul Ahmed Textile approves 15.75MW wind turbine procurement

News Image

MG News | November 16, 2026 at 09:45 AM GMT+05:00

November 16, 2026 (MLN): Gul Ahmed Textile Mills Limited (PSX: GATM) has approved the issuance of a Letter of Intent (LOI) for the procurement of two wind turbines with an aggregate capacity of 15.75 megawatts (MW).

The Board of Directors, through a resolution passed by circulation on November 14, 2026, approved the issuance of the LOI for the procurement of two wind turbines, each having a capacity of 7.875MW.

The turbines will be procured from Ming Yang Renewable Energy (International) Company Limited through Windtek (Private) Limited.

The aforementioned information was disseminated through a notification to Exchange.

Copyright Mettis Link News

 

Related News

Name Price/Vol %Chg/NChg
KSE100 179,346.53
31.63M
0.83%
1472.65
ALLSHR 107,647.95
242.69M
0.88%
935.88
KSE30 52,357.48
15.14M
0.91%
470.27
KMI30 257,843.95
15.45M
1.10%
2801.49
KMIALLSHR 69,912.77
40.41M
1.08%
749.92
BKTi 49,001.81
1.76M
0.55%
268.54
OGTi 36,910.81
4.37M
2.41%
867.75
Symbol Bid/Ask High/Low
Name Last High/Low Chg/%Chg
BITCOIN FUTURES 65,020.00 68,420.00
61,970.00
-3895.00
-5.65%
BRENT CRUDE 95.28 96.24
94.32
-0.56
-0.58%
RICHARDS BAY COAL MONTHLY 127.15 0.00
0.00
-0.15
-0.12%
ROTTERDAM COAL MONTHLY 138.00 0.00
0.00
1.60
1.17%
USD RBD PALM OLEIN 1,182.50 1,182.50
1,182.50
0.00
0.00%
CRUDE OIL - WTI 88.32 88.83
87.59
-0.24
-0.27%
SUGAR #11 WORLD 18.40 0.00
0.00
-0.01
-0.05%

Chart of the Day


Latest News
November 16, 2026 at 09:45 AM GMT+05:00

Gul Ahmed Textile approves 15.75MW wind turbine procurement


November 16, 2026 at 09:31 AM GMT+05:00

Oil slips toward $95 on global supply surplus concerns


November 16, 2026 at 09:31 AM GMT+05:00

PSX adds 9, drops 26 in KMI Islamic Index



Top 5 things to watch in this week

Pakistan Stock Movers
Name Last Chg/%Chg
Name Last Chg/%Chg