GGGL Powers up with 1.5MW solar plant at Rs120m

News Image

MG News | September 10, 2026 at 03:01 PM GMT+05:00

September 10, 2026 (MLN): Ghani Global Glass Limited (PSX: GGGL) has successfully commissioned and commenced operations of a 1.5 MW solar power generation system at a cost of Rs120 million.

The project represents an investment in renewable energy aimed at improving energy security, reducing the environmental impact of manufacturing operations, and lowering manufacturing costs.

The solar system is expected to reduce the plant’s dependence on electricity from the local grid, particularly during daylight operating hours, while delivering long-term operational benefits.

The aforementioned information was disseminated through a notification to Exchange.

Copyright Mettis Link News

Related News

Name Price/Vol %Chg/NChg
KSE100 168,865.04
260.11M
-1.79%
-3078.56
ALLSHR 102,295.04
620.28M
-1.94%
-2026.36
KSE30 50,247.11
77.13M
-1.81%
-925.02
KMI30 239,393.54
89.13M
-2.13%
-5220.44
KMIALLSHR 66,134.61
399.10M
-2.11%
-1423.05
BKTi 47,147.62
26.98M
-1.68%
-806.08
OGTi 34,242.17
7.08M
-2.08%
-726.14
Symbol Bid/Ask High/Low
Name Last High/Low Chg/%Chg
BITCOIN FUTURES 78,075.00 78,715.00
77,880.00
-295.00
-0.38%
BRENT CRUDE 102.07 102.72
100.19
0.86
0.85%
RICHARDS BAY COAL MONTHLY 130.00 0.00
0.00
2.10
1.64%
ROTTERDAM COAL MONTHLY 140.00 0.00
0.00
0.15
0.11%
USD RBD PALM OLEIN 1,228.00 1,228.00
1,228.00
0.00
0.00%
CRUDE OIL - WTI 97.42 97.84
95.37
1.37
1.43%
SUGAR #11 WORLD 18.68 18.70
18.30
0.28
1.52%

Chart of the Day


Latest News
September 10, 2026 at 03:18 PM GMT+05:00

Govt eyes Rs2tr SME, agri finance by 2028


September 10, 2026 at 03:01 PM GMT+05:00

GGGL Powers up with 1.5MW solar plant at Rs120m


September 10, 2026 at 02:59 PM GMT+05:00

KOHC FY26 profit softens 8%


September 10, 2026 at 02:30 PM GMT+05:00

IPAK Group earnings surge 7x to around Rs5bn in FY26



Top 5 things to watch in this week

Pakistan Stock Movers
Name Last Chg/%Chg
Name Last Chg/%Chg