Mettis Global News
Mettis Global News
Mettis Global News
Mettis Global News

Trending :

Pakistan Petroleum Limited Drills 1.3km long horizontal Well for Tight Gas

Share on facebook
Share on twitter
Share on linkedin
Share on whatsapp

Pakistan Petroleum Limited (PPL) recently drilled and completed tight gas horizontal well Naushahro Feroze (NF) Hor-1.

At total depth of 4940 meters and 1.3 km horizontal section in Chiltan Formation, NF Hor -1 is one of the deepest and longest horizontal wells in tight gas reservoir drilled in Pakistan. It is also the country’s first well to be completed with ten-stage multi-frack.

PPL made a tight gas discovery at NF X-1 in 2014. This was followed by extensive in-house geological and geophysical studies to design the optimum horizontal well to appraise the discovery. ‘Logging while drilling’ technology with real-time evaluation was used to successfully drill the horizontal section.

Based on preliminary results, the well produced 1.3 MMSCFD gas and 9 bpd of condensate at 32/64 choke size from one stage only. PPL plans to carry out ten-stage multi-frack job on the well which is expected to significantly increase flow potential.

NF Hor-1 is in Naushahro Feroze Block, Sindh, with PPL as operator holding 90 percent working interest and the remaining 10 percent held by Asia Resources Oil Limited.

Posted on: 2017-07-20T16:37:00+05:00